A maintenance day on the Sigurd trail below the crocked falls trail junction. Will involve addressing some of the trail braiding issues around the Large Douglas Fir tree. Installing rock filled gabion retaining and boardwalk (milled on site) and shovel work Please wear appropriate foot wear, gloves and backpack suitable for carrying small tools. bring launch and drinks.
More information to follow on the trip forum.
Interested in joining this trip or others like it? Sign in or sign up to join!