The main creek crossing on the Hanging Lake ski trail has been blown out by winter rainfall events in both of the last 2 seasons. To prevent this from happening again I plan to build a log bridge across the creek.
The objectives for this trip are to fell some suitable yellow cedar trees and peel the bark off the logs so they can be used as log stringers. The bridge will be assembled later in summer when the water levels have dropped.
Interested in joining this trip or others like it? Sign in or sign up to join!