New Watersprite Lake Trail Upgrades - Boardwalk and Steps

May 26, 2018 - 8:00 AM
May 26, 2018 - 10:00 PM

Organizer Info

Chris Ludwig

Meeting Point

St. Davids at 7:00am (As Usual)

Trip Details

Grade:
A1
Category:
Trail Clearing
Requirements:
  • Screening
  • Members Only
Max Participants:99

Trip Description

Oh yes, that time has at last come again!  It's the spring summer trail building season.

This will be a joint large-group/mob trip with Chasing Sunrise.  We will need as much muscle as possible.

Fat and out of shape after a winter of lethargy and excess?  Are you a newbie or beginner to the club?  Well this one is for you!

We are ready to put our plans into action to prepare the trail for the massive use expected this year.

On the itinerary:

1) The extension and upgrading of the existing Demon Creek Boardwalk at the .5 KM mark (yes, only 10 minutes from the parking lot).
2) The addition of up to three smaller new boardwalk segments
3) The Construction of two small bridges across two large water/mud filled cross-ditches just past Demon Creek Swamp
4) Removal of any deadfall and brush at the first 2 KM of trail
5) Inspection and repair of trail bridges and infrastructure after the winter season.
6) Construction of up to 100 new stairs and steps in the Connector Trail at KM 1.5

Volunteers will be performing the following task:

-A stop in Squamish to pick up building materials on the way (I will need one pickup truck that can carry all of the 8 foot 4x4 or 4x6 posts to the trailhead)
-Transporting lumber and building supplies (including rebar) from the trucks to the work site.
-Assistance in constructing, assembling and installing the boardwalks and stairs/steps
-Incidental clearing of vegetation from the trail.
-Repairing any damaged infrastructure
-Water management
-Enduring the endless berating and insults discharged from the trail crew chief with grace and poise.

I need two chainsaw operators available to cut the cedar rounds which will form the support for the boardwalk runners.

Recommended Safety Gear - Work Gloves, Eye Protection, Ear Protection (Extras available upon request for those who don't have them) 

This trip will be the first in a series of major trail upgrades and construction trips dedicated to BCMC maintained Trails.  Come join us and help make this worthy project come to life and subdue Demon Creek Swamp once and for all!

Section 57 authorization has been granted for this project.  Maximum participants Unlimited!

I have provided two GPX files for this trip (download them using the links on the bottom left of the page).  The first are the driving directions to the trailhead from Squamish, and the second is the GPX file for the trail itself.

The Existing Demon Creek Boardwalk and work-zone (built by the crew and I in 2017):

Participant List

12 / 99
Organizer
Chris Ludwig
55
Attended
1
Joined & Left
0
No-Shows
Confirmed
Antonio Vilanova
2
Attended
0
Joined & Left
1
No-Shows
Confirmed
1
Attended
0
Joined & Left
1
No-Shows
Confirmed
Rodrigo Samayoa
7
Attended
0
Joined & Left
0
No-Shows
Confirmed
Sterling Vanderzee
1
Attended
0
Joined & Left
0
No-Shows
Confirmed
Eve Noel
Non-Member
Confirmed
Dean Neumann
10
Attended
1
Joined & Left
0
No-Shows
Confirmed
Sarah Mooney
1
Attended
0
Joined & Left
0
No-Shows
Confirmed
Paul Olynek
179
Attended
5
Joined & Left
1
No-Shows
Confirmed
Kevin Swanson
2
Attended
0
Joined & Left
0
No-Shows
Confirmed
Gabrielle Burke
5
Attended
3
Joined & Left
0
No-Shows
Confirmed
Tom Green
7
Attended
0
Joined & Left
1
No-Shows
Confirmed
Fiona Dalton
18
Attended
1
Joined & Left
1
No-Shows
Confirmed
Lisa Demers
1
Attended
0
Joined & Left
0
No-Shows

Interested in joining this trip or others like it? Sign in or sign up to join!