New Watersprite Lake Trail Bridge Construction

Nov 11, 2016 - 6:59 AM
Nov 11, 2016 - 10:00 PM

Organizer Info

Chris Ludwig

Meeting Point

St. Davids at 7:00am (As Usual)

Trip Details

Grade:
A1
Category:
Trail Clearing
Requirements:
  • Screening
  • Members Only
Max Participants:99

Trip Description

The time has come to put some of the icing on the cake on the New Watersprite Lake Trail by installing two footbridges across the ever-so-frightening Skullhead Creek.   These two bridges are to be installed at KM .7 and KM 2.3 of the New Watersprite Lake Trail on old logging roads.  As the location of these bridges is close to the parking area, the amount of hiking will be very modest.

This is a great opportunity to learn about footbridge construction in the field.

 

Participant List

8 / 99
Organizer
Chris Ludwig
55
Attended
1
Joined & Left
0
No-Shows
Confirmed
Dan Giroday
12
Attended
1
Joined & Left
0
No-Shows
Confirmed
Goran Babic
21
Attended
4
Joined & Left
0
No-Shows
Confirmed
Paul Kubik
131
Attended
0
Joined & Left
0
No-Shows
Confirmed
Gavin Ludwig
Non-Member
Confirmed
Peter Malacarne
8
Attended
1
Joined & Left
1
No-Shows
Confirmed
Owen Fritch
3
Attended
0
Joined & Left
0
No-Shows
Confirmed
Steve Grant
28
Attended
1
Joined & Left
0
No-Shows

Interested in joining this trip or others like it? Sign in or sign up to join!