Construction of the New Watersprite Lake Trail continues with grubbing and scrubbing the Skookum Watersprite Spur!
Although last week's trail construction trip was cancelled, Paul Kubik, Steve Grant and David Scanlon were hard at work on the trail last weekend and grubbed and scrubbed the entire S1 Spur, and the Waterprite Skookum Spur still 200 meters past the waterfall.
Grubbing and scrubbing will continue from there (starting 200 meters past the red pin on the map below).
This trip will be the fifth in a series of trail clearing and construction trips dedicated to the New Watersprite Lake Trail, which will be used to access the club's new cabin.
Come join us and help make this worthy project come to life and get scrubbing!
Section 57 authorization has been granted for this project.
I have provided two GPX files for this trip (download them using the links on the bottom left of the page). The first are the driving directions to the trailhead from Squamish, and the second is the GPX file for the trail itself.
Note from Chris Ludwig:
Thanks to Paul Kubik for organizing this one and my regrets for being unable to attend. I'll be back...
Interested in joining this trip or others like it? Sign in or sign up to join!